200-Amp Panel Upgrade in Beaumont

Panel Upgrades · Beaumont, Lexington KY · JUN 2026

Before: 100-amp panel at capacity. After: 200-amp panel with room to grow.

A 1990s home in the Beaumont subdivision had a 100-amp panel that could not support a new HVAC system and an EV charger the homeowners wanted to add. We upgraded to a 200-amp service, replaced the meter base, pulled the Lexington-Fayette permit, and passed city inspection within three days of starting work.

More from the archive

Other jobs you might like